Request #168
Submitted 20250604 20:30:53
Request
| Contact | RM |
| Repository | HFsim |
| Generator | BeAGLE |
| Events | 700k |
| Benchmark | About 50 minutes, and output eicrecon file is about 30 MB. This test is run using a special geometry file where ZDC is excluded: "epic_craterlake_NO_ZDC_10x100_Au197.xml" |
| Estimate | 240 Core days and 200 GB |
Description
Filtered 10x100 eAu D0 events simulated by BeAGLE. They are used to study detector performance of D0 reconstruction. HEPMC files with beam effects can be found here: /gpfs02/eic/rongrong/SC_requests/BeAGLE/D0/eAu_10x100_Q2min1/hepmc_ab
Production Matches
| Task | Confidence | Reason | Matched |
|---|---|---|---|
|
group.EIC.26.02.0.epic_craterlake.p4252.e29.s1.r1
draft · 26.05.0
|
high | BeAGLE D0 eAu 10x100 Q2min1 request matched exact HFsim-BeAGLE D0_ABCONV 10x100 task. | codex/manual 20260618 11:24:03 |