Request #198
Submitted 20260213 08:17:33
Request
| Contact | DSOJ |
| Repository | EpIC_generator_MC_samples |
| Generator | EpIC |
| Events | 1M 5x41 hel. minus; 1M 5x41 hel. plus; 1.3M 10x100 hel. minus; 1.3M 10x100 hel. plus; 1.3M 10x130 hel. minus; 1.3M 10x130 hel. plus; 1M 10x250 hel. minus; 1M 10x250 hel. plus; 1M 18x275 hel. minus; 1M 18x275 hel. plus |
| Benchmark | 5x41 - 4 minutes (2.5' npsim, 1.5' eicrecon), 5.4MB; 10x100 - 7 minutes (5' npsim, 2' eicrecon), 5.2MB; 10x130 - 7 minutes (5' npsim, 2' eicrecon), 4.8MB; 10x250 - 11 minutes (8' npsim, 3' eicrecon), 4.9MB; 18x275 - 12 minutes (9' npsim, 3' eicrecon), 6.0MB |
| Estimate | Total: ~630 core days; 586 GB. These samples are updates to those currently used in the ePIC simulation campaigns which have been shown to contain errors. In addition, the time estimated is based on a simulation sample taken locally on the University of Glasgow servers, so will be a significant overestimate to the actual time required (considering just the event actions from npsim and eicrecon, this time is reduced to ~290 days) |
Description
EpIC v1.1.6, DVCS+BH+int, adding new beam energies and helicity settings
Production Matches
| Task | Confidence | Reason | Matched |
|---|---|---|---|
|
group.EIC.26.02.0.epic_craterlake.p3165.e2.s1.r1
draft · 26.05.0
|
high | EpIC DVCS+BH+interference request with listed beam energies matched current EpIC DVCS tasks for those energies. | codex/manual 20260618 11:24:03 |
|
group.EIC.26.02.0.epic_craterlake.p3166.e2.s1.r1
draft · 26.05.0
|
high | EpIC DVCS+BH+interference request with listed beam energies matched current EpIC DVCS tasks for those energies. | codex/manual 20260618 11:24:03 |
|
group.EIC.26.02.0.epic_craterlake.p3167.e2.s1.r1
draft · 26.05.0
|
high | EpIC DVCS+BH+interference request with listed beam energies matched current EpIC DVCS tasks for those energies. | codex/manual 20260618 11:24:03 |
|
group.EIC.26.02.0.epic_craterlake.p3168.e2.s1.r1
draft · 26.05.0
|
high | EpIC DVCS+BH+interference request with listed beam energies matched current EpIC DVCS tasks for those energies. | codex/manual 20260618 11:24:03 |
|
group.EIC.26.02.0.epic_craterlake.p3169.e2.s1.r1
draft · 26.05.0
|
high | EpIC DVCS+BH+interference request with listed beam energies matched current EpIC DVCS tasks for those energies. | codex/manual 20260618 11:24:03 |